Welcome to Xinli Boiler

Operations to be performed after the boiler is shut down

Guide: Stop the fire: first turn the small fire knob to the low fire position, and then turn off the burner.

1. Normal shutdown

  (1) Stop the fire: first turn the small fire knob to the low fire position, and then turn off the burner.

  (2) Reduce steam pressure.

   (3) Sheung Shui * water level.

  (4) Close the main steam valve.

  (5) Close the Sheung Shui Festival gate.

  (6) Close the gas throttle door.

  (7) Check whether the drain valve is closed and tight.

  (8) Turn off the main power switch.

   For the shutdown of the hot water boiler, the circulating pump cannot be stopped immediately after the burner is turned off.

2. Handling of temporary power outages

  (1) Close the main steam valve.

  (2) Turn off the main power supply.

Please Leave Your Needs.

we can recommend the right products for you according to your needs, please fill in the following form, we will contact you in time!

*
*
* Power or Capacity:

Xinli 7*24-hour service hotline

+86-13803825084

Contact QR Code

You can contact us

online chat
order
+86-13803825084
[email protected]
Back Top